References - order by fields of application

Select field of application:
Select reference: China, Hong Kong, Cheung Ching Tunnel
China, Hong Kong, Western Harbour Crossing (Highway Tunnel)
China, Jiaxing, Jiahua Power Co. Ltd.
Cyprus, Kaya Artemis Hotel
Iran, Acid Tank
Iran, Agajari Refinery
Iran, Meseh Sarchesmeh Mine, Chimney
Lithuania, Druskininkai, Chimney
Lithuania, Marijampole, Chimney
Thailand, Bangkok, Metro Tunnel
United Arab Emirates, Abu Dhabi, Regent Emirates Pearl
USA, Boston, Tip O'Neill Tunnel
Senegal, Dakar, tunnel
Deutschland, Jagel, Nato-Flugplatz
England, London, Cable ducts below DLR railways
Poland, Siedlce, Galvanizing plant
Poland, Warzawa, Zachariasza Str., Residential Building
Portugal, Leiria, Water tank
Turkey, Corlu, Ergene Vadisi
Turkey, Istanbul, Highway Crossing
Latvija, Jurmala, Sloka
Polska, Siedlce, Ocynkownia
Portugal, Barcelos, Edificio Habitacao
Portugal, Leiria, ROCA

Portugal, Leiria, Water tank

Object Water tank, Leiria, Portugal 
Fields of application Special waterproofing applications
Waterproofing tanks and pipes
 
Description Underground concrete reservoir waterproofing, previously made with plastic membrane that was falling to pieces. The walls were clean with water at 400 bar pressure, cleaned and repaired with repair mortar. After curing time, 3 layers of NB1 Grey were applied in 3,5 kg/m2. After the NB1 Grey, there was curing time of 15 days, before start filling the reservoir. Hot drinking water cylindric tin cans for the production of ceramic, had an epoxy coating with about 6 years old, that was failing and leaving small particles in the water. All the cylinders were sand blasted inside, and 2 layers of Corrosion Protection were applied in 1 kg/m2. Safe curing period of 8 days.  
Product applied KÖSTER Corrosion Protection
KÖSTER NB 1 Grey
KÖSTER Repair Mortar
 
Contractor ROCA